The Cost of an OT Outage Depends on How Much of the Plant You Have to Stop
Zscaler, Thursday, November 19th, 2026
A Zscaler author argues OT outage cost models should add the share of production that must stop, citing manufacturers' disclosures.
A Zscaler author revisits an Aberdeen OT risk model for a $100 million manufacturer that used incident frequency, downtime duration and the value of a production hour, giving a one-in-twenty chance of a loss above $13.2 million.
Citing disclosures from Boston Scientific (about $150 million in lost third-quarter sales), Jaguar Land Rover, MKS Instruments and Asahi, the author says losses came from stopped production, ordering or shipping rather than attackers reaching control systems.
The article proposes a fourth input, the share of production that has to stop; halving it cuts the one-in-twenty loss to about $6.6 million.
It recommends early detection with decoys, boundaries between corporate and each plant, segmentation by line and plans to run without enterprise systems.